Managing Dimension Tasks and Instances¶
In Metric Management, when a dimension table configured with Sync from Data Catalog or Sync from Database synchronization method is published, a dimension task will be created, and a task instance will be generated every time the dimension table is synchronized.
Note
After a dimension table is unpublished, the corresponding dimension tasks will also be deleted automatically.
Prerequisites¶
Before you start, ensure the following:
The current account has been assigned a menu group including Task Operation. If not assigned, contact the application administrator.
The dimension table has been configured with Sync from Data Catalog or Sync from Database synchronization method, and the dimension configuration has been published.
Viewing the Dimension Task List¶
Select Task Operation in the left navigation bar, which goes to the Dimension Task tab by default.
Pull down the drop-down box on the upper left corner of the page to switch between Periodical and Manual to view the list of dimension tasks under different synchronization types.
Viewing Dimension Task Instances¶
Select Task Operation in the left navigation bar, which goes to the Dimension Task tab by default.
Pull down the drop-down box on the upper left corner of the page to switch between Periodical and Manual.
In the current dimension task list, select View Instances at the end of the target dimension task row to go to the instance list page.
After filtering the time range in the upper left corner of the page, you can view information about task instances in the list.
Downloading Running Logs¶
Select Task Operation in the left navigation bar, which goes to the Dimension Task tab by default.
Pull down the drop-down box on the upper left corner of the page to switch between Periodical and Manual.
In the dimension task list, select View Instances at the end of the target dimension task row to go to the instance list page.
In the current time range, select Download Log at the end of the task instance line to download the instance running logs.
Restarting a Task Instance¶
Select Task Operation in the left navigation bar, which goes to the Dimension Task tab by default.
Pull down the drop-down box on the upper left corner of the page to switch between Periodical and Manual.
In the dimension task list, select View Instances at the end of the target dimension task row to go to the instance list page.
In the current time range, select Restart at the end of the row for the task instance that failed to run to resynchronize the data under this instance.